Project Details
Industry
Warehousing
Building
Warehouse
Engineer
Ing. Diego Fernando Solanilla
Building
Warehouse
Main Contractor
Constructora Parque Central
Flooring Application
Rinol Pisocreto
Partners Involved
Holcim (concrete)
RCR Products
Qualiroc Neutral (5kg/m2)
Permaban Eclipse, 3.467m
Date of Completion
4th May 2015
Technical Notes
High flatness required. Two areas with the following flatness worked: Area 75 Area VNA Fmin Jointless Large Bay, FF45 and FL40. Concrete floor MR40 , e = 20 cm quartz includes hardener 5kg / m2. There were changes in initial set temperature , 20 ° C at noon, 5 ° C at night early.
Download PDF